200A Service Panel Upgrades
Replace aging 60A/100A panels with a modern 200A service sized for heat pumps, EVs and shops.
Many prairie homes still run on 60A or 100A services that can't support heat pumps, EV chargers, hot tubs or a heated garage. We handle the whole upgrade: load calculation, permit, utility disconnect/reconnect coordination, new meter base, panel and grounding.
What's included
- CEC load calculation and permit filing
- Utility disconnect/reconnect coordination
- New meter base, mast and 200A panel
- Grounding & bonding to current code
- AFCI/GFCI protection where required
- Labelled circuit directory
Why it matters on the prairies
- — Prepares your home for electrification
- — Eliminates fuse and overheating risk
- — Often required by insurers
Sectors: Residential · Commercial
Frequently asked
How long does a 200A upgrade take?
Most residential upgrades are completed in one day of power-off time, after the permit and utility booking are in place.
Do I need a permit?
Yes. A service upgrade requires an electrical permit and inspection. We pull the permit and coordinate inspection for you.